May 06, 2024  
2020-2021 Academic Catalog 
    
2020-2021 Academic Catalog [ARCHIVED CATALOG]

PTRM 2227 - Pressure Pumping Operations

2 hr(s).
This course trains the student in the technology of pressure pumping operations with primary focus on cementing and hydraulic fracturing operations.  This course covers an in-depth review of pressure pumping equipment, chemical additives, purpose for cementing casing and the stimulation of shall gas reservoirs.
Prerequisite(s): PTRM 1104 , PTRM 1107 , PTRM 1109 , and MTH 1208  with a grade of “C” or better
Restriction(s): Applied Process Technology, Electric Utility Technology, and Petroleum Technology majors only